A wonderful reflection by Roger on Northern Rail fairytale. Starmer’s political broadcast last night was pure fantasy. Where’s he going to next as the man wanders the world.??
This seems to be the spirit of the times. Probably now is the moment for coming up with rail – and bus – infrastructure projects which can be substantially completed before the next election. If a Farage led government is next, who is to say what will not be cancelled?
If the main point of NPR is a faster route connecting Manchester and Leeds, get a simpler route designed and started a.s.a.p. If it is to give Bradford a better rail connection, that can be done – just make the prime consideration that it must be done quickly – even if we end up with not such a good final outcome.
In London, Crossrail 2 is already in the long grass: it may be the best long-term option, but if it is never built that is no compensation. But there are other ways to link terminals – how about connecting the Waterloo Wimbledon suburbans to the Overground Weavers from Liverpool Street, by enlarging the Waterloo and City tunnels. Don’t go in for Elizabeth Line style gold-plating (no awards for architects) just the minimum necessary to get the line up and running quickly!
Why is it so difficult to improve the service between Liverpool and Manchester history indicates that there were 4 lines built between Manchester and Liverpool. All 4 seem to still exist in some form but only two provide through services
A wonderful reflection by Roger on Northern Rail fairytale. Starmer’s political broadcast last night was pure fantasy. Where’s he going to next as the man wanders the world.??
the Wandering Busman.
LikeLiked by 1 person
Glad it’s not just me then.
Darryl in Dorset.
LikeLiked by 1 person
Brilliant, thanks as always Roger. RC
LikeLiked by 1 person
Two words, Leeds trams
LikeLike
This seems to be the spirit of the times. Probably now is the moment for coming up with rail – and bus – infrastructure projects which can be substantially completed before the next election. If a Farage led government is next, who is to say what will not be cancelled?
If the main point of NPR is a faster route connecting Manchester and Leeds, get a simpler route designed and started a.s.a.p. If it is to give Bradford a better rail connection, that can be done – just make the prime consideration that it must be done quickly – even if we end up with not such a good final outcome.
In London, Crossrail 2 is already in the long grass: it may be the best long-term option, but if it is never built that is no compensation. But there are other ways to link terminals – how about connecting the Waterloo Wimbledon suburbans to the Overground Weavers from Liverpool Street, by enlarging the Waterloo and City tunnels. Don’t go in for Elizabeth Line style gold-plating (no awards for architects) just the minimum necessary to get the line up and running quickly!
LikeLike
Why is it so difficult to improve the service between Liverpool and Manchester history indicates that there were 4 lines built between Manchester and Liverpool. All 4 seem to still exist in some form but only two provide through services
LikeLike
Kicked deep into the long grass once again.
LikeLike
It is bizarre that electrification west and north form Sheffield is now being proposed a few months after wires on the MML was ‘paused.’ (Euphemism).
LikeLike